Scope, select, deploy or migrate an ERP keeping the business process as the reference — and control of total cost of ownership as the constraint.

EN UNE PHRASE

An ERP project is a process project.

THE PROBLEM

The situations that bring us in

  • 01

    The solution was chosen before the processes were analysed.

  • 02

    Custom code accumulates to reproduce the way things used to be done.

  • 03

    Data migration is handled at the end of the project, under schedule pressure.

  • 04

    Real cost of ownership was never assessed beyond the first year.

  1. 01THE PROBLEM

    An ERP project committed on the perimeter of a tool, with no documented target processes and no acceptance criteria.

  2. 02WHAT AXENEO DOES

    We take up the target processes, assess every departure from the standard, structure the data migration and steer acceptance testing through to switchover.

  3. 03THE RESULT

    A rollout whose perimeter is stable, departures from the standard owned and documented, and a switchover that is prepared and reversible.

What we do

Upstream

  • Diagnosis of the processes and of the existing system
  • Target processes and management rules
  • Help selecting a solution and going to market
  • Business case, cost of ownership and scenarios

Implementation

  • Functional design and oversight of the configuration
  • Standard versus custom trade-offs
  • Data migration: rules, controls, reconciliation
  • Acceptance testing, training, switchover and stabilisation

The ERP & Business Applications method

This domain sits within the pillar’s overall method.
  1. 01

    Scope the processes

    The target process is defined before the tool. Business rules, exceptions and volumes are documented — that is what determines the real effort.

  2. 02

    Choose with eyes open

    The evaluation covers real coverage of the requirements, the integration effort, the cost of ownership and whether the choice can be sustained.

  3. 03

    Design within the standard

    Every departure from the standard is examined: the real need, the alternative, the cost of maintaining it. Custom development is an informed decision, not a default.

  4. 04

    Secure the data

    Data migration is treated as a workstream in its own right: perimeter, rules, trial runs, reconciliation and controls.

  5. 05

    Integrate and validate

    Interfaces are mapped and tested end to end. Functional validation and regression testing govern the go-live decision.

  6. 06

    Keep it alive

    Support, evolutive maintenance and continuous improvement: the value of an ERP is mostly built after go-live.

USE CASES

Where we step in

  • Replace or modernise

    Assess the alternative between a full rebuild and progressive modernisation of the existing foundation, on the merits.

  • Harmonise after growth

    Several entities, several sets of practices: build a shared core model without denying local constraints.